A reactor design that cools itself using gravity and stored water

A reactor design that cools itself using gravity and stored water
Image: Intellect (generated)

In short: The AP1000 is a nuclear reactor built to remove its own leftover heat with water that flows by gravity, even if operators take no action. Its designers also aimed to cut building costs by simplifying the plant. Its story shows how safety claims, construction delays and economics can pull in different directions.

The AP1000 is a pressurized water reactor offered by Westinghouse Electric Company. Its planned net output is 1,117 MWe. The design grew out of earlier Westinghouse work, including the 4-loop SNUPPS design and the smaller AP600, which attracted little interest at its lower output. Re-scaled upward, the design found several buyers. A central feature is passive cooling. Even after a reactor is shut down, its radioactive decay products keep producing heat, and that heat has to be removed to prevent meltdown.

In the AP1000, a tank of water sitting above the reactor drains by gravity onto the core, where the water evaporates and carries heat away. The system is designed to start within the first 30 minutes without relying on external or diesel power, and it is intended to remove heat for 72 hours, after which the gravity drain tank must be topped up. The plant also uses fewer components, less concrete and reinforcing steel than older designs, and simpler piping, all aimed at lowering cost.

The design has been contested. Arnold Gundersen, an engineer commissioned by anti-nuclear groups, argued that the steel containment liner could rust through, while Westinghouse said the liner is several times thicker than those in current designs. The Nuclear Regulatory Commission required changes to the shield building, and one commissioner filed a dissent. Economics proved the harder test. Cost overruns and delays at the Vogtle and Virgil C. Summer projects contributed to Westinghouse's 2017 Chapter 11 filing. Unit 3 at Vogtle entered service in mid-2023 and Unit 4 in early 2024, and the estimated cost of the two units rose from about $14 billion to $30 billion.

Opens the Intellect+ feed with this card first. Swipe up for the next one.

Sources

  • Summary by Intellect · source: AP1000

To cite this card, link to https://intellectplus.co.uk/app/science-ap1000.

How we source, check and correct cards: Editorial standards.

General information, not professional advice. Spotted an error? Flag the card or see corrections and complaints.

Intellect Plus is a visual educational discovery platform for exploring fascinating facts and ideas. Brain Food, Not Brain Rot. What is Intellect Plus?

Related

Finding something worth knowing…