Britain's Class 800 trains can run on wires or on their own diesel power
In short: Britain's Class 800 trains switch between overhead electric power and onboard diesel generators, so they can run beyond the electrified network. Built by Hitachi between 2014 and 2018, they replaced older InterCity fleets. Their early years show how complex modern trains can be, with delays and structural cracks. Here is how they work.
The Class 800 is a bi-mode multiple unit. Its electric motors draw power from overhead lines where they exist, and underfloor diesel generators take over beyond the electrified network. The change between modes can happen at line speed, so passengers notice little disruption. The trains were built by Hitachi as part of the UK Government's Intercity Express Programme, which aimed to replace the InterCity 125 and InterCity 225 fleets. Bodyshells were made in Japan and assembled at Newton Aycliffe. Each generator unit packages a V12 diesel engine, a generator, a radiator and exhaust cleaning equipment meeting the Stage IIIB European standard. Because the power converter works with both sources, a separate converter for each mode is not needed, which saves weight and complexity. A five-car set carries three generator units and a nine-car set carries five, while the electric-only Class 801 has a single unit for emergency power.
Adding or removing generator units converts one class into the other. The trains entered service on the Great Western Main Line in October 2017, and on the East Coast Main Line in May 2019. Early operation was difficult. The launch was marred by a water leak from an air conditioning unit, and the East Coast introduction was postponed by six months because of electromagnetic emissions that reportedly disturbed signals. Modern Railways magazine also argued that cramped space makes the generator units prone to overheating. The most serious problems were structural. Fatigue cracks appeared in the aluminium body shells near the yaw damper brackets, and in 2021 cracks were found in the welds of lifting pads, prompting most units to be suspended for a time. The Office of Rail and Road attributed the fatigue to greater loads than specified, probably from wheel wear and track design. The lifting-pad cracks were linked to residual welding stresses and salt air near the coast, and 1,247 vehicles needed repair.
The interiors have drawn mixed reviews. Passengers welcomed extra legroom and more seats in standard class, but the seats were called uncomfortable on long journeys, and first class seats lost their leather because of fire regulations. The fleet also has a notable accident record. In 2019, a Class 800 ran into the rear of a Class 43 powercar at Neville Hill Depot in Leeds. The Rail Accident Investigation Branch found that driver error was the cause, with insufficient driver training an underlying factor, and noted that the design did not account for derailment performance at low collision speeds.
Opens the Intellect+ feed with this card first. Swipe up for the next one.
Sources
- Summary by Intellect · source: British Rail Class 800
- Also: Wikidata — British Rail Class 800 · CC0
To cite this card, link to https://intellectplus.co.uk/app/technology-british-rail-class-800.
How we source, check and correct cards: Editorial standards.
General information, not professional advice. Spotted an error? Flag the card or see corrections and complaints.
Intellect Plus is a visual educational discovery platform for exploring fascinating facts and ideas. Brain Food, Not Brain Rot. What is Intellect Plus?
Related
More in Engineering · More in Technology · Latest · A–Z · All topics